Waste Water Reclamation Plant Detail Engineering
Total Installed Project Cost—$6 Million

Working with EQM and GE Zenon in process design, EQE developed a total installation package for a new Water Reclamation Plant. The package included specifications and engineering for diverting 1,000 GPM of flow to the new facility, engineering and installation of new pumps, controls, fluid cooler and cooling tower. Equipment specifications and bid analysis for all required equipment were also provided to customer for review.