BOF MACT Detail Engineering
Total Installed Project Cost—$53 Million

EQE designed a Secondary Emissions Collection System to collect charging and tapping emissions from existing BOF vessels. The scope of engineering included supplying all mechanical, piping and ductwork design, structural and civil design for foundations, supports and reinforcements, as well as transformer, PLC and motor control design and specification.